Energy and Utilities Experience

 

Power Generation and Transmission
Mozambique
Jindal Thermal Power Station in Tete (2600MW): Resettlement Action Plan
MepandaUncua HEP (1300 MW): Preliminary and Feasibility Studies
CahoraBassa Extension (600 MW): Preliminary and Feasibility Studies

Malawi
Nkula Falls “A” HEP (24 MW): study design and construction supervision
Nkula Falls “B” HEP (100 MW): study, design and construction supervision
Tedzani I HEP (20 MW): study design and construction supervision
Tedzani II HEP (20 MW): study design and construction supervision
Kapichira HEP (128 MW): study design and construction supervision
Least Cost Development Plan:  update of Least-Cost Development Plan
Power Development & System Operations Study:  detailed system and demand forecast studies
Power Development Study:  site investigation and survey programme
Capacity Utilization Study:  optimisation study of existing and future facilities
Hydroelectric Development of Shire River:  identification and evaluation studies
Hydroelectric Development of Remote Areas of Malawi: identification and evaluation studies
ESCOM Asset Valuation Study.  Valuation of the power and commercial assets of the utility.

Zimbabwe
Hwange Coal-fired Station Phase 1 (480 MW): study design and supervision
Hwange Coal-fired Station Phase 2 (440 MW): study design and supervision
Bulawayo Coal-fired Station (120 MW): study design and construction supervision
Gokwe Coal-fired Station (1400 MW): investigation and preliminary design
Kariba South Bank (300 MW): independent condition review of existing hydroelectric scheme

Zambia
Mulungushi HEP (20 MW): design, supervision, monitoring, routine inspections
Mita Hills Dam (Uprating Lunsemfwa HEP): study, design, construction supervision, inspection
Victoria Falls “B” HEP (60 MW): study design and construction supervision
Victoria Falls “C” HEP (40 MW): study, design and construction supervision
Victoria Falls “D” HEP (250 MW): study and preliminary design
Kafue Gorge HEP (900 MW): site investigation, engineering, detailed design
Itezhi-Tezhi Dam: Hydrological, environmental studies, site investigation and engineering review
Luapula River HE Development (1200 MW): evaluation (14 sites), outline design (5 schemes)
Rural Hydropower Schemes:Kasama A (1.2MW), Kasama B (4.8 MW), Mansa (5 MW) and Mbala (0.75 MW): investigation, design and construction supervision
Lusiwasi HEP (Phases 1 and 2): Investigation, design and construction supervision
Lusiwasi HEP (Phase 3): preliminary design
Lusiwasi HEP: rehabilitation study
Kariba South Bank Review (300 MW): condition evaluation
Batoka Gorge HEP Feasibility Study (1600 MW): study, design
Rural Hydropower Stations Rehabilitation Study: condition assessment and evaluation
Valuation of Kariba Dam: condition assessment and valuation
Lumangwe Falls Hydroelectric Scheme (12 MW):  review of hydropower potential and feasibility studies
Development of Luitikila River Basin. planning study for irrigation and hydropower
Nyamgombe Micro Hydro Potential.  assessment study
Office for Promoting Private Power Investment.preparation of solicitation documents for private power development of hydropower and transmission projects.
EIA of the Kafue River Basin. Study of sustainable use of water resources for municipal and agricultural supplies, hydropower generation and maintenance of the environment of the Kafue Flats.
Zambia-Tanzania Interconnector: Feasibility studies of 700 km long 330 kV interconnector.

Scott Wilson has also been involved in the design and construction supervision of coal fired and diesel power stations in Lusaka and Ndola, and the study of numerous micro and mini hydro schemes around the country.